info@aljizeenergy.com +968 93851087

OUR PROJECTS

ENGINE: G.E. Frame 5 (Single& Dual Shaft) HEAVY DUTY GAS TURBINES

Location: Various Sites in the Oil & Gas Facilities, MiddleEast, Australia, etc (Qatar Gas, Karratha LNG).


TEAM PROJECT EXPERIENCE:
Major Inspection (M.I.)
Hot Gas Path Inspection (HGPI)
Turbine blades/Shrouds replacement
Rotor Replacement
Bearing Inspection
Combustion Can replacement
Fuel Nozzlesreplacement/upgrades
Auxiliary Inspection
Control SystemUpgrade
Instrumentation upgrades/calibration

SERVICES PACKAGES OPTIONS:
1. Combustion Inspection(CI) -6 DAYS
2. Hot Gas Path Inspection (HGPI)- 11 DAYS
3. Major Inspection (MI)- 17 DAYS
* Flange to Flange, 2 shifts



AL JIZE ENERGY L L C

Post box no :132, Plot no 157, Muscat, Ghala, Oman
Ph: +968 93851087
Email: info@aljizeenergy.com